Long shot of school showing adventure playground and grassed areas View of school from roadside Modern classroom with timber floor and chairs and desks Long shot of side elevation of school building
Overview

This project required the construction of two double storey buildings plus one single storey building and surrounding landscaping works. Constructed using natural limestone blocks and suspended concrete slabs, restricted access and extensive limestone pinnacles were challenging. The works also included excavation and removal of a substantial existing limestone rock wall which Focus replaced with a large limestone retaining wall to envelope the site. Strategic demolition was required of the existing convent, kindergarten and playground to enable the staged redevelopment of the school. 

+