Swimming pool showing vaulted ceiling Exterior and entry to swimming centre Long view of swimming pool showing mural on wall
Overview

Focus Building Company along with architects The Buchan Group were appointed by PEET Ltd and ISPT to design and construct a new swim school for Swim WA in August 2017.

Focus and Buchan had previously completed the $50 Million Lakelands Shopping Centre in Mandurah and the Swim School extends the facilities available at the Centre.

The Swim School features a 25m long concrete pool along with changing facilities in an architect designed building envelope. The air conditioned interior has a vaulted ceiling to maximise the sense of space.

+